Back to overview
Maintenance
Infrastructure Migration
Jan 03 at 10:30pm HST
–
Jan 04 at 05:00am HST
Resolved
Jan 03 at 10:30pm HST
The physical rack will be migrating to a fully dedicated rack within the same data center to benefit from improved network connectivity, increased capacity, and enhanced cooling capabilities.
Maintenance Window
Start: 4 January 2025 @ 15.30 WIB.
End: 4 January 2026 @ 22.00 WIB.
Affected services